Software Engineering Lab experiment one
active 2025-07-25 → 2025-08-09 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 16 days from 2025-07-25 to 2025-08-09. Pushes: 24 total, peak 23 in a day. Pull requests: 7 total, peak 7 in a day. Issues: 40 total, peak 15 in a day. Comments: 1 total, peak 1 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| aryatam | 63 | 18 | 6 | 1 |
| dorsanaji | 11 | 4 | 1 | 0 |
| github-actions[bot] | 2 | 2 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
- Issue#35aryatam2025-08-09 17:32Refactor and pass all tests
- Issue#36aryatam2025-08-09 17:24Write final report
- Issue#34aryatam2025-08-09 17:22Implement new feature in AccountBalanceCalculator
- Issue#36aryatam2025-08-09 17:13Write final report
- Issue#35aryatam2025-08-09 17:13Refactor and pass all tests
- Issue#34aryatam2025-08-09 17:12Implement new feature in AccountBalanceCalculator
- Issue#32aryatam2025-08-09 16:54Identify existing bug in code
- Issue#31aryatam2025-08-09 16:41Run existing tests
- Issue#29aryatam2025-08-09 16:14Create repo and first commit
- Issue#30aryatam2025-08-09 16:14Download and review base project
- Issue#32aryatam2025-08-09 16:01Identify existing bug in code
- Issue#31aryatam2025-08-09 16:01Run existing tests
- Issue#30aryatam2025-08-09 16:01Download and review base project
- Issue#29aryatam2025-08-09 16:01Create repo and first commit
- Issue#28aryatam2025-08-02 17:26Refactor for SOLID (Stage 5)
- Issue#27aryatam2025-08-02 17:06Document violations & propose fixes (Stage 4)
- Issue#25aryatam2025-08-02 16:38Stage 2 Table
- Issue#23aryatam2025-08-02 15:53Initialize Step-01-without-solid
- Issue#28aryatam2025-08-02 15:47Refactor for SOLID (Stage 5)
- Issue#27aryatam2025-08-02 15:47Document violations & propose fixes (Stage 4)
- Issue#24aryatam2025-08-02 15:46Implement TelegramMessage class (Stage 1)
- Issue#23aryatam2025-08-02 15:45Initialize Step-01-without-solid
- Issue#22aryatam2025-08-02 15:35Clone the MessageSendingPractice folder and push it to Team GitHub repo
- Issue#21aryatam2025-08-02 15:03Create a new GitHub repository for the project
- Pull request#20aryatam2025-07-26 18:20
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.