active 2025-06-18 → 2025-08-06 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 50 days from 2025-06-18 to 2025-08-06. Pushes: 1 total, peak 1 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 51 total, peak 9 in a day. Comments: 7 total, peak 2 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| adampbeardsley | 58 | 0 | 0 | 7 |
Recent activity
Latest issues, pull requests and releases
- Issue#18adampbeardsley2025-08-06 13:20Send post-workshop survey
- Issue comment#40adampbeardsley2025-08-06 13:19put slides in github
- Issue#40adampbeardsley2025-08-06 13:19put slides in github
- Issue#5adampbeardsley2025-07-16 16:48Pre-build anything for teachers
- Issue#2adampbeardsley2025-07-16 16:48Compile info to send before workshop
- Issue#17adampbeardsley2025-07-16 16:32Make a take-home (packing) list for teachers
- Issue#40adampbeardsley2025-07-16 15:56put slides in github
- Issue comment#36adampbeardsley2025-07-15 20:06Find alternative cardboard sources
- Issue#39adampbeardsley2025-07-15 20:06Burn four SD cards for ALPhA
- Issue#6adampbeardsley2025-07-15 20:06Pre-build for ALPhA
- Issue#39adampbeardsley2025-07-15 17:01Burn four SD cards for ALPhA
- Issue#14adampbeardsley2025-07-15 14:22Slides showing how to plan an observation
- Issue#27adampbeardsley2025-07-15 14:22Review/revise Day 2 slides
- Issue#25adampbeardsley2025-07-14 15:03Photo release form
- Issue#35adampbeardsley2025-07-13 01:09Drill soup can lids
- Issue#37adampbeardsley2025-07-11 16:36Slides navigating to server
- Issue#37adampbeardsley2025-07-11 15:37Slides navigating to server
- Issue#33adampbeardsley2025-07-11 14:14Add science standards early on
- Issue#19adampbeardsley2025-07-11 01:39Get cardboard
- Issue#7adampbeardsley2025-07-10 17:46Update BoM
- Issue#30adampbeardsley2025-07-09 21:39Update introductions slides
- Issue#36adampbeardsley2025-07-09 13:14Find alternative cardboard sources
- Issue#34adampbeardsley2025-07-08 20:21Add Ahlea's "Hot Tips" for construction
- Issue#4adampbeardsley2025-07-08 19:37Assemble monitors
- Issue#31adampbeardsley2025-07-08 19:26Add slides walking through horn/electronics build
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.