plotting and data import toolbox for watertap
active 2024-08-28 → 2026-06-24 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 666 days from 2024-08-28 to 2026-06-24. Pushes: 46 total, peak 5 in a day. Pull requests: 3 total, peak 1 in a day. Issues: 0 total, peak 0 in a day. Comments: 1 total, peak 1 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| avdudchenko | 46 | 44 | 2 | 0 |
| Copilot | 2 | 1 | 0 | 1 |
| TimBartholomew | 1 | 0 | 1 | 0 |
| zacharybinger | 1 | 1 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
- Releaseavdudchenko2026-04-25 04:13Minor updates to costing managment and break down plotter
- Pull request#5avdudchenko2026-03-11 18:57
- Releaseavdudchenko2026-01-23 03:10Fixes minor issues with new Numpy versions, issues with stacking, and general clean up.
- Pull request#3TimBartholomew2025-11-20 19:58
- Releaseavdudchenko2025-10-21 18:43Refactors to use pytoml install, adds yaml install, and starts clean up
- Pull request#1avdudchenko2025-10-21 18:40
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.