Skip to content

Highly available Prometheus setup with long term storage capabilities. A CNCF Incubating project.

active 2024-06-152024-07-10 (UTC)

Complete coverage27,187 / 27,189 hourly files (100%) · 2 absent upstream2023-08-152026-09-20 (UTC)
Events
18
Pushes
12
Pull requests
4
Issues
0
Stars
1
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 26 days from 2024-06-15 to 2024-07-10. Pushes: 12 total, peak 3 in a day. Pull requests: 4 total, peak 4 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 1 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
ayushrakesh161240

Recent activity

Latest issues, pull requests and releases

  • Pull request#2ayushrakesh2024-06-15 18:11
  • Pull request#2ayushrakesh2024-06-15 17:50
  • Pull request#1ayushrakesh2024-06-15 17:45
  • Pull request#1ayushrakesh2024-06-15 17:40

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 1 stars here means stars gained during the window, not the repo's star count.