Optimism is Ethereum, scaled.
active 2024-05-20 → 2024-11-01 (UTC)
Complete coverage26,721 / 26,721 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-09-01 (UTC)
Events
380
Pushes
95
Pull requests
31
Issues
21
Stars
2
Forks
1
Activity over time
Daily event counts in the loaded window
Line chart, 166 days from 2024-05-20 to 2024-11-01. Pushes: 95 total, peak 12 in a day. Pull requests: 31 total, peak 4 in a day. Issues: 21 total, peak 4 in a day. Comments: 100 total, peak 22 in a day. Stars: 2 total, peak 1 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| bap2pecs | 194 | 41 | 16 | 66 |
| lesterli | 110 | 50 | 13 | 23 |
| SebastianElvis | 18 | 0 | 0 | 9 |
| parketh | 13 | 4 | 2 | 2 |
Recent activity
Latest issues, pull requests and releases
- Pull request#15bap2pecs2024-07-31 21:44
- Issue comment#7bap2pecs2024-07-31 21:44feat: add Babylon Finality Gadget For OP Stack
- Pull request#7bap2pecs2024-07-31 21:44
- Pull request#27bap2pecs2024-07-31 20:53
- Issue comment#26lesterli2024-07-31 02:03fix plasma_test.go
- Pull request#26lesterli2024-07-31 02:03
- Issue#9bap2pecs2024-07-31 01:18L1/L2 Reorg Handling
- Issue comment#9bap2pecs2024-07-31 01:18L1/L2 Reorg Handling
- Issue comment#10bap2pecs2024-07-31 01:17doc: design document for OP stack integration
- Issue#10bap2pecs2024-07-31 01:17doc: design document for OP stack integration
- Issue#24bap2pecs2024-07-31 01:17fix tests
- Issue comment#24bap2pecs2024-07-31 01:15fix tests
- Pull request#27bap2pecs2024-07-30 03:28
- Pull request#25lesterli2024-07-30 02:20
- Pull request#26lesterli2024-07-29 13:59
- Pull request#25lesterli2024-07-28 13:36
- Issue#24bap2pecs2024-07-26 23:59fix finalizer_test.go
- Pull request#23bap2pecs2024-07-26 23:56
- Issue comment#23bap2pecs2024-07-16 22:05feat: update `tryFinalize()` to check finality on each L2 block
- Issue comment#23bap2pecs2024-07-16 21:52feat: update `tryFinalize()` to check finality on each L2 block
- Pull request#23lesterli2024-07-12 01:54
- Issue#14parketh2024-07-09 21:17`op-node` build error: 'cannot use wasmCapabilities'
- Issue#12parketh2024-07-09 21:15add Babylon to OP rollup chain configs
- Issue#22bap2pecs2024-07-09 20:48op-node: finality gadget
- Issue#8bap2pecs2024-07-09 20:44reorg tracker for L1 reorgs
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 2 stars here means stars gained during the window, not the repo's star count.