Skip to content

The Badge.team website

active 2023-09-032026-08-14 (UTC)

Complete coverage26,551 / 26,551 hourly files (100%) · 2 absent upstream2023-08-152026-08-25 (UTC)
Events
522
Pushes
187
Pull requests
124
Issues
19
Stars
2
Forks
4

Activity over time

Daily event counts in the loaded window

Line chart, 1077 days from 2023-09-03 to 2026-08-14. Pushes: 187 total, peak 21 in a day. Pull requests: 124 total, peak 22 in a day. Issues: 19 total, peak 5 in a day. Comments: 47 total, peak 7 in a day. Stars: 2 total, peak 2 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
NightOwlNL14160533
ranzbak131304222
renzenicolai97552011
jhaand321059
annejan181800
Kuristian9810
aris-kimi3011
pitastrudl3021
edent1000

Recent activity

Latest issues, pull requests and releases

  • Issue comment#197ranzbak2026-03-14 10:39
    Source parts when producing 500 badges
  • Issue comment#188ranzbak2026-02-13 10:35
    Find PCB/PCBA-sponsor production path
  • Issue#204ranzbak2026-02-13 10:34
    Verify Bluetooth antenna design
  • Issue comment#193ranzbak2026-02-13 10:30
    Badge prototype needs to be verified and brought up.
  • Issue#186ranzbak2026-02-01 17:15
    Verify/update unit cost per badge design, ongoing
  • Issue comment#194ranzbak2026-02-01 11:11
    Create MeshCore Cyber Ægg Meshcore hardware target
  • Issue comment#186ranzbak2026-02-01 11:09
    Verify/update unit cost per badge design, ongoing
  • Issue comment#204ranzbak2026-02-01 11:03
    Verify Bluetooth antenna design
  • Issue comment#197ranzbak2026-02-01 11:03
    Source parts when producing 500 badges
  • Issue comment#204ranzbak2026-01-26 19:50
    Verify Bluetooth antenna design
  • Issue comment#184ranzbak2026-01-26 19:47
    Get NRF52 IC's to Allnet China
  • Issue comment#201ranzbak2026-01-26 19:45
    Prototype one ordering
  • Issue comment#186renzenicolai2026-01-19 01:12
    Verify/update unit cost per badge design, ongoing
  • Issue#187ranzbak2026-01-17 17:58
    Double check soldermask + clearances QIAA NRF52 socket
  • Issue comment#186ranzbak2026-01-17 16:17
    Verify/update unit cost per badge design, ongoing
  • Issue#205ranzbak2026-01-17 12:57
    Get PCB to point Prototype 1 can be ordered
  • Issue#195ranzbak2026-01-17 12:24
    Verify power usage Cyber Ægg
  • Issue#188ranzbak2026-01-17 12:13
    Find PCB/PCBA-sponsor production path
  • Issue#185ranzbak2026-01-17 11:49
    Request sponsoring SX1262 LoRa IC
  • Issue comment#182jhaand2025-12-31 23:53
    Add end of year message 2026
  • Pull request#182ranzbak2025-12-30 18:50
  • Pull request#181renzenicolai2025-09-02 20:36
  • Issue comment#175ranzbak2025-08-28 19:26
    Add CC-BY license file
  • Pull request#179renzenicolai2025-07-09 20:12
  • Issue#177jhaand2025-07-09 19:57
    Add dedicated Contact page

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 2 stars here means stars gained during the window, not the repo's star count.