active 2025-02-19 → 2025-06-11 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 113 days from 2025-02-19 to 2025-06-11. Pushes: 104 total, peak 9 in a day. Pull requests: 24 total, peak 4 in a day. Issues: 14 total, peak 11 in a day. Comments: 19 total, peak 4 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| bbn | 145 | 102 | 24 | 5 |
| vercel[bot] | 13 | 0 | 0 | 13 |
| claude[bot] | 3 | 2 | 0 | 1 |
Recent activity
Latest issues, pull requests and releases
- Pull request#33bbn2025-06-11 01:13
- Issue comment#33vercel[bot]2025-06-10 17:56Add demo-simple patch and echo gear
- Pull request#33bbn2025-06-10 17:56
- Pull request#32bbn2025-06-10 12:46
- Issue comment#32vercel[bot]2025-06-10 12:31Add comprehensive SSRF protection tests
- Issue#17bbn2025-06-10 12:28Mock Validation Missing in End-to-End Integration Test
- Pull request#31bbn2025-06-10 12:27
- Issue#30bbn2025-06-09 17:38Split Large beforeAll Setup in Integration Test
- Issue#29bbn2025-06-09 17:38Extract Event Parsing Logic Helper
- Issue#28bbn2025-06-09 17:38Variable Naming Improvements in Integration Test
- Issue#26bbn2025-06-09 17:38Test Organization - Break Down Large Test
- Issue#25bbn2025-06-09 17:38Setup/Teardown Missing in Integration Test
- Issue#24bbn2025-06-09 17:38Inconsistent Async Patterns in Integration Test
- Issue#23bbn2025-06-09 17:38Magic Numbers in Integration Test
- Issue#21bbn2025-06-09 17:38Limited Assertion Coverage in Integration Test
- Issue#20bbn2025-06-09 17:38Missing Error Scenarios in End-to-End Integration Test
- Issue#19bbn2025-06-09 17:38Hard-coded Mock Implementation in Integration Test
- Issue#17bbn2025-06-09 17:36Mock Validation Missing in End-to-End Integration Test
- Issue comment#15claude[bot]2025-06-09 17:21Add end-to-end runtime integration test
- Issue comment#15bbn2025-06-09 17:21Add end-to-end runtime integration test
- Pull request#16bbn2025-06-09 17:07
- Issue comment#16vercel[bot]2025-06-09 17:06Add Claude Code GitHub Workflow
- Pull request#16bbn2025-06-09 17:06
- Issue comment#15vercel[bot]2025-06-09 16:48Add end-to-end runtime integration test
- Pull request#15bbn2025-06-09 16:48
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.