Skip to content

用于在 900MHz ISM 限制运行的 Itron ERT 兼容智能电表的 rtl-sdr 接收器

active 2023-08-15 → 2026-09-05 (UTC)

Complete coverage27,472 / 27,472 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-02 (UTC)
Events
664
Pushes
8
Pull requests
5
Issues
29
Stars
503
Forks
40

Activity over time

Daily event counts in the loaded window

Line chart, 1118 days from 2023-08-15 to 2026-09-05. Pushes: 8 total, peak 4 in a day. Pull requests: 5 total, peak 3 in a day. Issues: 29 total, peak 6 in a day. Comments: 77 total, peak 14 in a day. Stars: 503 total, peak 21 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
bemasher318014
puterboy130012
jwvanderbeck5004
stazeo4002
Entropy5123001
greyltc3012
dependabot[bot]3021
pyrodex2001
fjleon19802001
cefoster02002
andhab12001
jrddunbr2011
rstremke2001
mattman-19782000
adsr2001
uriva9w2000
pir8radio2002
zachliu2002
Oxalin2002
m0sia2001

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 503 stars here means stars gained during the window, not the repo's star count.