Skip to content

buildingSMART/validate

View on GitHub ↗Related repositories →

buildingSMART Validation service

active 2023-09-02 → 2026-09-30 (UTC)

Complete coverage28,389 / 28,389 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-11-09 (UTC)
Events
2.4K
Pushes
877
Pull requests
393
Issues
19
Stars
34
Forks
5

Activity over time

Daily event counts in the loaded window

Line chart, 1125 days from 2023-09-02 to 2026-09-30. Pushes: 877 total, peak 14 in a day. Pull requests: 393 total, peak 15 in a day. Issues: 19 total, peak 2 in a day. Comments: 294 total, peak 26 in a day. Stars: 34 total, peak 2 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
rw-bsi58329120353
Ghesselink4052406352
aothms3499165102
civilx64244705852
bSI-Bot17617600
evandroAlfieri618323
RickBrice19008
fg55b2001
berlotti1100
semonw1001
rubendecuypere1001
JTurbakiewicz1010
Amrfawzy91001

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 34 stars here means stars gained during the window, not the repo's star count.