active 2026-02-27 → 2026-07-05 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 129 days from 2026-02-27 to 2026-07-05. Pushes: 8 total, peak 3 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 27 total, peak 14 in a day. Comments: 0 total, peak 0 in a day. Stars: 1 total, peak 1 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| Mohammed159159 | 35 | 8 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
- Issue#167Mohammed1591592026-03-22 05:19Finalizing Arm CAD with wiring
- Issue#165Mohammed1591592026-03-14 23:41Finalizing actuator selection
- Issue#176Mohammed1591592026-03-12 11:18Simulating pick/place of the arm in MATLAB
- Issue#176Mohammed1591592026-03-12 11:18Simulating pick/place of the arm in MATLAB
- Issue#112Mohammed1591592026-03-12 11:18Stress and deflection analysis
- Issue#112Mohammed1591592026-03-12 11:18Stress and deflection analysis
- Issue#114Mohammed1591592026-03-05 04:01Arm manufacturing drawings
- Issue#114Mohammed1591592026-03-05 04:01Arm manufacturing drawings
- Issue#165Mohammed1591592026-03-05 02:03Finalizing actuator selection
- Issue#127Mohammed1591592026-03-05 02:02Arm electronics PCB
- Issue#127Mohammed1591592026-03-05 02:02Arm electronics PCB
- Issue#170Mohammed1591592026-03-05 01:58Preparing a simulation environment
- Issue#169Mohammed1591592026-03-05 00:53Verify each module independently
- Issue#167Mohammed1591592026-03-04 23:21Finalizing Arm CAD
- Issue#166Mohammed1591592026-03-04 23:20Finalizing electronics schematic
- Issue#144Mohammed1591592026-03-04 23:20Actuator selection
- Issue#160Mohammed1591592026-03-04 21:59Calibration procedures
- Issue#156Mohammed1591592026-03-04 21:59Select drivers
- Issue#146Mohammed1591592026-03-04 21:58Develop communication
- Issue#142Mohammed1591592026-03-04 21:58Validating kinematic models
- Issue#141Mohammed1591592026-03-04 21:58Simulation for validating kinematic models
- Issue#140Mohammed1591592026-03-04 21:58Safety interlocks
- Issue#136Mohammed1591592026-03-04 21:58Arm kinematic modeling
- Issue#132Mohammed1591592026-03-04 21:57Source components and fabricate PCBs
- Issue#124Mohammed1591592026-03-04 21:57Assemble base, arm, and components
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 1 stars here means stars gained during the window, not the repo's star count.