Skip to content

LG 유플러스 유레카 2기 종합프로젝트 3조 백엔드 Repository

active 2025-05-26 → 2025-06-26 (UTC)

Complete coverage27,338 / 27,338 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-09-27 (UTC)
Events
369
Pushes
124
Pull requests
65
Issues
0
Stars
0
Forks
1

Activity over time

Daily event counts in the loaded window

Line chart, 32 days from 2025-05-26 to 2025-06-26. Pushes: 124 total, peak 27 in a day. Pull requests: 65 total, peak 12 in a day. Issues: 0 total, peak 0 in a day. Comments: 93 total, peak 36 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
pillow1236014280378
coderabbitai[bot]940075
SongMinQQ4715168
LuaKimm241551
choi-hi15840
Jetty-Lee12631

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.