Bridge for Git and Clearcase, modified for BR ESW2
active 2023-08-18 → 2025-05-13 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 635 days from 2023-08-18 to 2025-05-13. Pushes: 0 total, peak 0 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 2 total, peak 2 in a day. Comments: 3 total, peak 1 in a day. Stars: 16 total, peak 1 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| kendegemaro | 4 | 0 | 0 | 2 |
| charleso | 1 | 0 | 0 | 1 |
Recent activity
Latest issues, pull requests and releases
- Issue comment#96kendegemaro2024-06-13 09:06Only CC main branch code is migrated for all the branches.
- Issue#103kendegemaro2024-06-10 10:31Unable to rebase symbolic links / symlinks / sym links
- Issue comment#103charleso2024-06-10 09:08Unable to rebase symbolic links / symlinks / sym links
- Issue#103kendegemaro2024-06-10 08:43Unable to rebase symbolic links / symlinks / sym links
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 16 stars here means stars gained during the window, not the repo's star count.