Skip to content

chenyao2005/bit-SoftwareProjectManagement

View on GitHub ↗Related repositories →

本次大作业旨在让个人作为独立PM,学习撰写项目计划和版本迭代等流程,最后学习使用agent编程,完成一个完整的系统。

active 2026-04-032026-04-11 (UTC)

Complete coverage26,625 / 26,625 hourly files (100%) · 2 absent upstream2023-08-152026-08-28 (UTC)
Events
13
Pushes
6
Pull requests
2
Issues
0
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 9 days from 2026-04-03 to 2026-04-11. Pushes: 6 total, peak 4 in a day. Pull requests: 2 total, peak 1 in a day. Issues: 0 total, peak 0 in a day. Comments: 3 total, peak 2 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
chenyao200511623

Recent activity

Latest issues, pull requests and releases

  • Pull request#6chenyao20052026-04-11 16:22
  • Issue comment#5chenyao20052026-04-10 02:46
    升级《项目计划》至 v3.0 并修改需求变更单(新增移动端H5需求及工期延展)
  • Issue comment#5chenyao20052026-04-10 02:45
    升级《项目计划》至 v3.0 并修改需求变更单(新增移动端H5需求及工期延展)
  • Pull request#5chenyao20052026-04-10 02:44
  • Issue comment#3chenyao20052026-04-06 08:57
    提交项目计划V1.1和数据库设计文档

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.