Skip to content

A repository to keep record of CLAMS apps

active 2023-08-15 → 2026-10-06 (UTC)

Archive files: complete28,641 / 28,641 hourly files accounted for (100%) · 2 absent upstream2023-08-15 → 2026-11-20 (UTC)Some event types are under-captured. Data limits →
Events
924
Pushes
384
Pull requests
205
Issues
15
Recorded stars
0
Recorded forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 1149 days from 2023-08-15 to 2026-10-06. Pushes: 384 total, peak 11 in a day. Pull requests: 205 total, peak 6 in a day. Issues: 15 total, peak 2 in a day. Comments: 55 total, peak 7 in a day. Recorded stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Recorded stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
clams-bot3312281020
keighrim3111458944
marcverhagen12226
kelleyl12352
kla79630
snewman-aa3012
shel-ho2020
owencking1000
Brendayy1001
1192119703jzx1010

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.