Skip to content

clamsproject/clams-utils

View on GitHub ↗Related repositories →

A collection of smaller helper/utility code of CLAMS platform

active 2023-12-11 → 2026-09-27 (UTC)

Complete coverage28,128 / 28,128 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-29 (UTC)
Events
56
Pushes
26
Pull requests
4
Issues
4
Stars
1
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 1022 days from 2023-12-11 to 2026-09-27. Pushes: 26 total, peak 4 in a day. Pull requests: 4 total, peak 1 in a day. Issues: 4 total, peak 2 in a day. Comments: 5 total, peak 2 in a day. Stars: 1 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
keighrim271425
selenasong9520
github-actions[bot]3300
jyoune2200
1192119703jzx2200

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 1 stars here means stars gained during the window, not the repo's star count.