Skip to content

Job and workshop management for custom manufacturers: quoting, jobs, timesheets, purchasing, payroll, Xero. Django + django-ninja, React + TanStack.

active 2026-03-14 → 2026-10-05 (UTC)

Complete coverage27,547 / 27,547 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-05 (UTC)
Events
1.3K
Pushes
437
Pull requests
301
Issues
0
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 206 days from 2026-03-14 to 2026-10-05. Pushes: 437 total, peak 50 in a day. Pull requests: 301 total, peak 57 in a day. Issues: 0 total, peak 0 in a day. Comments: 85 total, peak 10 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
corrin5393858325
dependabot[bot]277492173
Copilot402128
coderabbitai[bot]320021
github-advanced-security[bot]14008
github-actions[bot]1100

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.