Skip to content

SIGL - Sistema Integral de Gestión de Laboratorios (un CRM/ERP para los laboratorios del campus)

active 2026-03-06 → 2026-06-07 (UTC)

Complete coverage28,301 / 28,301 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-11-06 (UTC)
Events
28
Pushes
21
Pull requests
0
Issues
3
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 94 days from 2026-03-06 to 2026-06-07. Pushes: 21 total, peak 5 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 3 total, peak 2 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
joeyalcocerdev11900
cr0ssd7700
pedcapa4400
bsjc10241100
Heroofwar12341000

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.