Skip to content

An open source python library to generate business process diagram using code or plain text.

active 2023-08-17 → 2026-03-30 (UTC)

Complete coverage27,413 / 27,413 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-09-30 (UTC)
Events
338
Pushes
45
Pull requests
8
Issues
32
Stars
113
Forks
13

Activity over time

Daily event counts in the loaded window

Line chart, 957 days from 2023-08-17 to 2026-03-30. Pushes: 45 total, peak 5 in a day. Pull requests: 8 total, peak 2 in a day. Issues: 32 total, peak 3 in a day. Comments: 63 total, peak 5 in a day. Stars: 113 total, peak 4 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
csgoh10245735
vetertann8006
marconimedeiros27003
nraffa-five17006
vigneshkumarravisankar4003
ijimin3001
r-erd3002
vectoire3002
nhpf3001
42sol-eu2001
edqu12001
Charizhardt2010
sreekaribh1000

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 113 stars here means stars gained during the window, not the repo's star count.