Skip to content

This library handles the communication with heating engineering via the eBUS specification. This protocol is used by many heating manufacturers in Europe.

active 2023-10-22 → 2025-10-23 (UTC)

Complete coverage27,596 / 27,596 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-07 (UTC)
Events
116
Pushes
33
Pull requests
23
Issues
3
Stars
3
Forks
2

Activity over time

Daily event counts in the loaded window

Line chart, 733 days from 2023-10-22 to 2025-10-23. Pushes: 33 total, peak 11 in a day. Pull requests: 23 total, peak 10 in a day. Issues: 3 total, peak 2 in a day. Comments: 27 total, peak 15 in a day. Stars: 3 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
csowada5833203
sonarqubecloud[bot]190019
dependabot[bot]5032
ogkita2002
torsten-rupp2001

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 3 stars here means stars gained during the window, not the repo's star count.