Skip to content

active 2025-11-022026-08-09 (UTC)

Partial coverage13,930 / 16,685 hourly files (83%) · 2 absent upstream · 2,754 failed, retryable2024-09-152026-08-11 (UTC)— sampled evenly across the window, so rankings and trends hold; absolute counts scale up.
Events
117
Pushes
47
Pull requests
15
Issues
4
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 281 days from 2025-11-02 to 2026-08-09. Pushes: 47 total, peak 17 in a day. Pull requests: 15 total, peak 7 in a day. Issues: 4 total, peak 2 in a day. Comments: 22 total, peak 9 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
devnull03534042
Copilot385920
pumpkinguy316220

Recent activity

Latest issues, pull requests and releases

  • Issue#17devnull032025-12-08 04:43
    Project Creation workflow
  • Issue#16pumpkinguy312025-12-06 11:33
    Desired features: Export as csv, and, Import file from Google Drive
  • Issue#14pumpkinguy312025-12-06 11:30
    Settings window can still be made to crash if swapping between projects.
  • Releasedevnull032025-12-06 09:19
    COMP 371 Final project submission (dev version 1)
  • Pull request#13Copilot2025-12-06 05:34
  • Pull request#12Copilot2025-12-06 05:30
  • Issue comment#11Copilot2025-12-06 05:27
    Proper project management + finalized project files structure
  • Issue comment#11Copilot2025-12-06 05:23
    Proper project management + finalized project files structure
  • Pull request#12Copilot2025-12-06 05:23
  • Pull request#12Copilot2025-12-06 05:23
  • Pull request#11devnull032025-12-06 05:10
  • Pull request#10pumpkinguy312025-12-05 13:25
  • Pull request#9pumpkinguy312025-12-05 04:38
  • Pull request#9devnull032025-12-05 04:06
  • Issue#8devnull032025-12-05 03:51
    Migrate Data Grid from RevoGrid to Svelte-TableCN (TanStack)
  • Pull request#1devnull032025-12-04 02:39
  • Pull request#5Copilot2025-12-04 02:30
  • Pull request#4devnull032025-12-04 02:21
  • Pull request#2Copilot2025-12-04 02:19
  • Issue comment#1Copilot2025-12-04 02:14
    Layout management change
  • Pull request#3Copilot2025-12-04 02:14
  • Issue comment#1Copilot2025-12-04 02:14
    Layout management change
  • Pull request#2Copilot2025-12-04 02:14
  • Pull request#2Copilot2025-12-04 02:14

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.