当你顺利的从零基础过来了或者想直接上手,我们提供了第二阶段的实训。 实训包括了精心设计的迭代项目,也有生产项目和github上的优秀项目。 项目会有预热环节来做启动,报名人数严格控制,没有报名上的依然可以提交作业,但不会被批改。言下之意你可以旁听。 实训有单独开发,也有协同合作。按照等级严格划分,只有通过第一个项目的,才能进入下一个项目的实�
active 2024-10-23 → 2025-03-24 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 153 days from 2024-10-23 to 2025-03-24. Pushes: 3 total, peak 3 in a day. Pull requests: 4 total, peak 4 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| devsirius51 | 7 | 3 | 4 | 0 |
Recent activity
Latest issues, pull requests and releases
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.