Skip to content

disk91/WioLoRaWANFieldTester

View on GitHub ↗Related repositories →

Seed Studio device survey tool

active 2023-08-29 → 2026-01-22 (UTC)

Complete coverage27,936 / 27,936 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-21 (UTC)
Events
52
Pushes
6
Pull requests
8
Issues
12
Stars
8
Forks
3

Activity over time

Daily event counts in the loaded window

Line chart, 878 days from 2023-08-29 to 2026-01-22. Pushes: 6 total, peak 6 in a day. Pull requests: 8 total, peak 4 in a day. Issues: 12 total, peak 4 in a day. Comments: 15 total, peak 5 in a day. Stars: 8 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
disk91246410
thompsa5041
mheadpme2001
miodzicho2001
disarticulate2001
paulkanz1000
MaffooClock1001
sctv1000
surumadurum1000
s33butler1000
nickganga1000

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 8 stars here means stars gained during the window, not the repo's star count.