Skip to content

espressif/idf-im-cli

View on GitHub ↗Related repositories →

ESP-IDF Installation Manager - CLI

active 2024-06-21 → 2026-02-25 (UTC)

Archive files: complete28,596 / 28,596 hourly files accounted for (100%) · 2 absent upstream2023-08-15 → 2026-11-18 (UTC)Some event types are under-captured. Data limits →
Events
852
Pushes
383
Pull requests
184
Issues
1
Recorded stars
14
Recorded forks
1

Activity over time

Daily event counts in the loaded window

Line chart, 615 days from 2024-06-21 to 2026-02-25. Pushes: 383 total, peak 18 in a day. Pull requests: 184 total, peak 8 in a day. Issues: 1 total, peak 1 in a day. Comments: 94 total, peak 28 in a day. Recorded stars: 14 total, peak 3 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Recorded stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
Hahihula42323115420
Fabricio-ESP1801362112
kolipakakondal7416932
github-actions[bot]220022
brianignacio512005
AndriiFilippov2002
wuyuanyi1351000
alirana011001

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 14 stars here means stars gained during the window, not the repo's star count.