Skip to content

AI-powered git commit message rewriter using Ollama or GPT

active 2025-11-102026-06-21 (UTC)

Complete coverage26,591 / 26,591 hourly files (100%) · 2 absent upstream2023-08-152026-08-26 (UTC)
Events
614
Pushes
38
Pull requests
6
Issues
19
Stars
511
Forks
5

Activity over time

Daily event counts in the loaded window

Line chart, 224 days from 2025-11-10 to 2026-06-21. Pushes: 38 total, peak 15 in a day. Pull requests: 6 total, peak 2 in a day. Issues: 19 total, peak 6 in a day. Comments: 27 total, peak 8 in a day. Stars: 511 total, peak 97 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

Recent activity

Latest issues, pull requests and releases

  • Issue#27amirparsadd2025-12-15 11:57
    Base URL Configuration
  • Issue#25Dmitry01082025-11-27 21:06
    Use Openrouter api
  • Issue comment#24devin-ai-integration[bot]2025-11-27 18:48
    feat: add commit splitting feature for cleaner git history
  • Pull request#23ionkr2025-11-26 03:54
  • Pull request#21Copilot2025-11-18 18:27
  • Pull request#21Copilot2025-11-18 18:27
  • Issue#10f2025-11-17 06:56
    Command failed: git diff-tree --no-commit-id
  • Issue#13f2025-11-17 06:56
    Wrong commits rewritten
  • Issue#17f2025-11-17 06:55
    [feature]Easy prompt overrides per repo
  • Issue comment#17f2025-11-17 06:55
    [feature]Easy prompt overrides per repo
  • Issue comment#19f2025-11-17 06:18
    [feature] Local Ollama url override
  • Issue#18f2025-11-16 23:15
    [bug] log output corrupting generated commit output
  • Issue#18f2025-11-16 23:03
    [bug] log output corrupting generated commit output
  • Issue#17f2025-11-16 22:56
    [feature]Easy prompt overrides per repo
  • Issue comment#17f2025-11-16 22:56
    [feature]Easy prompt overrides per repo
  • Issue#19RyanHope2025-11-16 18:31
    [feature] Local Ollama url override
  • Issue#18RyanHope2025-11-16 18:26
    [bug] log output corrupting generated commit output
  • Issue comment#13f2025-11-16 08:37
    Wrong commits rewritten
  • Issue comment#13f2025-11-16 08:37
    Wrong commits rewritten
  • Issue#16RyanHope2025-11-16 01:25
    Model override for hooks
  • Issue comment#10f2025-11-15 19:25
    Command failed: git diff-tree --no-commit-id
  • Issue comment#6geeknik2025-11-15 18:16
    Fix RCE, data exfiltration, and supply chain vulnerabilities
  • Issue comment#8dietervansteenwegen2025-11-15 13:18
    Invalid OpenAI API key is silently ignored
  • Issue comment#9dietervansteenwegen2025-11-15 08:32
    Verify OpenAI API key
  • Issue comment#2sebastienbarre2025-11-15 07:08
    Error on execution

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 511 stars here means stars gained during the window, not the repo's star count.