Skip to content

CIM是一套基于netty框架下的推送系统,或许有一些企业有着自己一套即时通讯系统的需求,那么CIM为您提供了一个解决方案,目前CIM支撑 websocket,android,ios,桌面应用,系统应用等多端接入支持,可应用于移动应用,物联网,智能家居,嵌入式开发,桌面应用,WEB应用以及后台系统之间的即时消服务

active 2023-09-23 → 2026-03-04 (UTC)

Complete coverage28,275 / 28,275 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-11-05 (UTC)
Events
41
Pushes
0
Pull requests
0
Issues
1
Stars
29
Forks
11

Activity over time

Daily event counts in the loaded window

Line chart, 894 days from 2023-09-23 to 2026-03-04. Pushes: 0 total, peak 0 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 1 total, peak 1 in a day. Comments: 0 total, peak 0 in a day. Stars: 29 total, peak 2 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
Arooba-git1000

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 29 stars here means stars gained during the window, not the repo's star count.