Skip to content

fmrico/cascade_lifecycle

View on GitHub ↗Related repositories →

Managed nodes (or lifecycle nodes, LN) package provides a mechanism to create LifecycleNode activation trees

active 2023-09-09 → 2026-10-19 (UTC)

Complete coverage27,967 / 27,967 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-23 (UTC)
Events
166
Pushes
64
Pull requests
26
Issues
3
Stars
32
Forks
5

Activity over time

Daily event counts in the loaded window

Line chart, 1137 days from 2023-09-09 to 2026-10-19. Pushes: 64 total, peak 13 in a day. Pull requests: 26 total, peak 5 in a day. Issues: 3 total, peak 1 in a day. Comments: 9 total, peak 4 in a day. Stars: 32 total, peak 4 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
fmrico9364217
Juancams4031
ahcorde3011
viprob-ai1000
alberthli1000
DLu1010

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 32 stars here means stars gained during the window, not the repo's star count.