Skip to content

fpeanut/Pointpillar_tensorrt

View on GitHub ↗Related repositories →

pointpillar mmdeteion3d model Tensorrt deployment, improved and faster

active 2023-12-292026-04-05 (UTC)

Partial coverage18,478 / 23,723 hourly files (78%) · 2 absent upstream · 5,242 failed, retryable2023-11-282026-08-12 (UTC)— sampled evenly across the window, so rankings and trends hold; absolute counts scale up.
Events
9
Pushes
1
Pull requests
0
Issues
1
Stars
4
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 829 days from 2023-12-29 to 2026-04-05. Pushes: 1 total, peak 1 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 1 total, peak 1 in a day. Comments: 1 total, peak 1 in a day. Stars: 4 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
fpeanut2101
zhaiyuqiang1000

Recent activity

Latest issues, pull requests and releases

  • Issue#2zhaiyuqiang2026-04-05 10:08
    为啥可视化目标有漏检?
  • Issue comment#1fpeanut2025-04-10 01:55
    模型和转换工具版本

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 4 stars here means stars gained during the window, not the repo's star count.