Skip to content

Create publication-quality figures with precise size control in Matplotlib

active 2023-09-02 → 2026-09-07 (UTC)

Complete coverage28,335 / 28,335 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-11-07 (UTC)
Events
450
Pushes
90
Pull requests
87
Issues
0
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 1102 days from 2023-09-02 to 2026-09-07. Pushes: 90 total, peak 9 in a day. Pull requests: 87 total, peak 5 in a day. Issues: 0 total, peak 0 in a day. Comments: 121 total, peak 36 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
fschuch121383812
coderabbitai[bot]940066
pre-commit-ci[bot]7048220
dependabot[bot]352276
sonarqubecloud[bot]300030
sonarcloud[bot]5005
github-actions[bot]2200
codecov-commenter2002

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.