AI-powered coaching CRM platform with Four Lenses personality insights and secure client management tools.
active 2026-01-10 → 2026-01-10 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 1 days from 2026-01-10 to 2026-01-10. Pushes: 5 total, peak 5 in a day. Pull requests: 6 total, peak 6 in a day. Issues: 12 total, peak 12 in a day. Comments: 1 total, peak 1 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| gacurl | 24 | 5 | 6 | 1 |
Recent activity
Latest issues, pull requests and releases
- Pull request#132gacurl2026-01-10 20:59
- Issue#124gacurl2026-01-10 19:59Issue 8-3: Verify production environment boots cleanly
- Issue comment#124gacurl2026-01-10 19:59Issue 8-3: Verify production environment boots cleanly
- Issue#123gacurl2026-01-10 19:47Issue 8-2: Remove broken links from mailer templates
- Issue#122gacurl2026-01-10 19:42Issue 8-1: Remove broken and placeholder links from user-facing views
- Pull request#131gacurl2026-01-10 19:42
- Pull request#130gacurl2026-01-10 18:44
- Pull request#130gacurl2026-01-10 18:42
- Issue#120gacurl2026-01-10 17:38Issue 5-5: Audit admin controllers for TODOs and silent failure patterns
- Issue#119gacurl2026-01-10 17:16Issue 5-4: Remove “coming soon” and placeholder patterns from admin UI
- Pull request#128gacurl2026-01-10 17:16
- Pull request#128gacurl2026-01-10 17:12
- Issue#126gacurl2026-01-10 16:32Issue 8-5: Perform production smoke test of core flows
- Issue#125gacurl2026-01-10 16:32Issue 8-4: Deploy application to production hosting
- Issue#124gacurl2026-01-10 16:32Issue 8-3: Verify production environment boots cleanly
- Issue#123gacurl2026-01-10 16:31Issue 8-2: Remove broken links from mailer templates
- Issue#121gacurl2026-01-10 16:26Issue 5-6: Final admin navigation and link integrity verification
- Issue#120gacurl2026-01-10 16:26Issue 5-5: Audit admin controllers for TODOs and silent failure patterns
- Issue#118gacurl2026-01-10 16:25Issue 5-3: Remove remaining admin write actions and affordances
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.