Skip to content

Test repo for Speckit/GSD GitHub sync testing

active 2026-01-192026-01-19 (UTC)

Partial coverage20,515 / 26,271 hourly files (78%) · 2 absent upstream · 5,753 failed, retryable2023-08-152026-08-13 (UTC)— sampled evenly across the window, so rankings and trends hold; absolute counts scale up.
Events
18
Pushes
2
Pull requests
0
Issues
13
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 1 days from 2026-01-19 to 2026-01-19. Pushes: 2 total, peak 2 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 13 total, peak 13 in a day. Comments: 2 total, peak 2 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
gptprojectmanager17202

Recent activity

Latest issues, pull requests and releases

  • Issue comment#12gptprojectmanager2026-01-19 17:55
    [Plan-02-01] Test Speckit taskstoissues sync
  • Issue#20gptprojectmanager2026-01-19 17:55
    [Plan-03-04] E2E test: fresh GSD sync with milestone
  • Issue#20gptprojectmanager2026-01-19 17:55
    [Plan-03-04] E2E test: fresh GSD sync with milestone
  • Issue#20gptprojectmanager2026-01-19 17:55
    [Plan-03-04] E2E test: fresh GSD sync with milestone
  • Issue comment#10gptprojectmanager2026-01-19 17:42
    [Plan-01-01] Setup repository structure and workflows
  • Issue#14gptprojectmanager2026-01-19 17:42
    [Plan-03-01] Test GitHub Project board integration
  • Issue#14gptprojectmanager2026-01-19 17:42
    [Plan-03-01] Test GitHub Project board integration
  • Issue#14gptprojectmanager2026-01-19 17:42
    [Plan-03-01] Test GitHub Project board integration
  • Issue#13gptprojectmanager2026-01-19 17:42
    [Plan-02-02] Test bidirectional sync (close issue → mark task complete)
  • Issue#10gptprojectmanager2026-01-19 17:42
    [Plan-01-01] Setup repository structure and workflows
  • Issue#8gptprojectmanager2026-01-19 16:39
    [T008] Create priority labels (P1, P2, P3)
  • Issue#8gptprojectmanager2026-01-19 16:39
    [T008] Create priority labels (P1, P2, P3)
  • Issue#8gptprojectmanager2026-01-19 16:39
    [T008] Create priority labels (P1, P2, P3)
  • Issue#5gptprojectmanager2026-01-19 16:39
    [T005] Define v1.0 milestone requirements
  • Issue#5gptprojectmanager2026-01-19 16:39
    [T005] Define v1.0 milestone requirements

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.