Skip to content

DRAM Bank-Aware Kernel Memory Allocator

active 2023-09-212026-04-05 (UTC)

Complete coverage26,356 / 26,356 hourly files (100%) · 2 absent upstream2023-08-152026-08-17 (UTC)
Events
38
Pushes
20
Pull requests
2
Issues
2
Stars
9
Forks
3

Activity over time

Daily event counts in the loaded window

Line chart, 928 days from 2023-09-21 to 2026-04-05. Pushes: 20 total, peak 7 in a day. Pull requests: 2 total, peak 1 in a day. Issues: 2 total, peak 1 in a day. Comments: 1 total, peak 1 in a day. Stars: 9 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
heechul212010
cwm03271000
hwsecguy1001
ElvischenPY1000
crsullivan131010

Recent activity

Latest issues, pull requests and releases

  • Issue#22cwm03272024-10-12 03:06
    Issue about detect-mc-mapping.sh fails with sched_setscheduler failed: Operation not permitted
  • Pull request#21heechul2024-05-02 10:24
  • Pull request#21crsullivan132024-05-01 20:22
  • Issue#20ElvischenPY2024-01-10 07:26
    test code
  • Issue comment#18hwsecguy2023-10-18 18:20
    Kernel build fails when adding new parameters

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 9 stars here means stars gained during the window, not the repo's star count.