active 2025-11-27 → 2025-12-28 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 32 days from 2025-11-27 to 2025-12-28. Pushes: 14 total, peak 8 in a day. Pull requests: 7 total, peak 5 in a day. Issues: 29 total, peak 18 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| eman1181 | 37 | 11 | 5 | 0 |
| hodda22 | 10 | 3 | 2 | 0 |
| ryadelshemi555-blip | 3 | 0 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
- Issue#15eman11812025-12-28 03:21CI: Add GitHub Actions pipeline
- Issue#15eman11812025-12-28 03:21CI: Add GitHub Actions pipeline
- Issue#15eman11812025-12-28 03:19CI: Add GitHub Actions pipeline
- Issue#17eman11812025-12-28 03:19Docs: SRS updated to match Phase 2 site
- Issue#18eman11812025-12-28 03:18Docs: Scrum meeting summaries (3+)
- Issue#18eman11812025-12-28 03:18Docs: Scrum meeting summaries (3+)
- Pull request#22eman11812025-12-28 03:07
- Pull request#20eman11812025-12-28 02:44
- Pull request#20eman11812025-12-28 02:44
- Pull request#19eman11812025-12-28 02:25
- Issue#18eman11812025-12-28 02:17Docs: Scrum meeting summaries (3+)
- Issue#18eman11812025-12-28 02:17Docs: Scrum meeting summaries (3+)
- Issue#18eman11812025-12-28 02:17Docs: Scrum meeting summaries (3+)
- Issue#17eman11812025-12-28 02:16Docs: SRS updated to match Phase 2 site
- Issue#17eman11812025-12-28 02:16Docs: SRS updated to match Phase 2 site
- Issue#17eman11812025-12-28 02:16Docs: SRS updated to match Phase 2 site
- Issue#17eman11812025-12-28 02:16Docs: SRS updated to match Phase 2 site
- Issue#16eman11812025-12-28 02:16CD: Deploy to GitHub Pages
- Issue#16eman11812025-12-28 02:16CD: Deploy to GitHub Pages
- Issue#15eman11812025-12-28 02:15CI: Add GitHub Actions pipeline
- Issue#15eman11812025-12-28 02:15CI: Add GitHub Actions pipeline
- Issue#14eman11812025-12-28 02:09Enhancement: Add password reset (Future Work)
- Pull request#13eman11812025-12-28 01:02
- Issue#12ryadelshemi555-blip2025-12-08 22:31Update README.md with project structure and run instructions
- Issue#11ryadelshemi555-blip2025-12-08 22:31Complete frontend styling (navbar, hero, layout)
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.