Skip to content

active 2026-04-132026-07-20 (UTC)

Complete coverage26,364 / 26,364 hourly files (100%) · 2 absent upstream2023-08-152026-08-17 (UTC)
Events
220
Pushes
98
Pull requests
7
Issues
45
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 99 days from 2026-04-13 to 2026-07-20. Pushes: 98 total, peak 12 in a day. Pull requests: 7 total, peak 3 in a day. Issues: 45 total, peak 14 in a day. Comments: 50 total, peak 15 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
holee918298634
hnabyz-bot160015
dependabot[bot]2011

Recent activity

Latest issues, pull requests and releases

  • Issue comment#58holee92026-05-09 07:56
    [main] EARS P1B 요구사항 작성 — ENH / DISP / DICOM
  • Issue comment#84holee92026-05-09 07:54
    [main] Gate G2 실측 실행 — 전체 파이프라인 성능·메모리 측정 및 게이트 통과 확인
  • Pull request#92holee92026-05-09 07:41
  • Issue#91holee92026-05-09 07:30
    [GUI-C] AiBridgeStatusComputer R2-Available 상태 테스트 추가
  • Issue#61holee92026-05-09 07:29
    [Post-B] SPEC-XPE-GSVG 정의 및 gsvg.dll 구현 착수
  • Issue#39holee92026-05-09 07:29
    [S-IOP-CORE] DICOM Conformance Statement 및 상호운용성 검증
  • Issue comment#21holee92026-05-09 07:29
    [S0-A] Build Infrastructure (Google Test + CTest 통합)
  • Issue comment#54holee92026-05-09 07:29
    [Pre-A] BP-01~05 Benchmark 동결 — Preprocess DegradedMode GTest
  • Pull request#87holee92026-05-09 06:36
  • Issue#81holee92026-05-09 04:57
    [Pre-A] SPEC-SIMD-001 완전 구현 — REQ-SIMD-001/002 Offset·Gain parity 활성화
  • Issue#75holee92026-05-09 04:02
    [작업] main: Moai/Claude workflow config 2.14.0 동기화
  • Issue#73holee92026-05-09 04:02
    [Pre-A] P1A 심각 결함 4건 + REQ-P1A-066 오류 경로 테스트
  • Issue comment#71holee92026-05-09 03:55
    [작업] Post-B post-processing worktree 잔여 구현 및 검증 정리
  • Issue#68holee92026-04-28 06:53
    [Pre-A] Offset 이중 구현 제거 + SIMD dispatch 활성화
  • Issue comment#22holee92026-04-28 06:27
    [S0-B] xpe_common.dll 완성 (18 functions)
  • Issue comment#59holee92026-04-28 05:10
    [main] IEC 62304 VVP sync — P2-ADV / P1A / P1B 검증계획 완성
  • Issue comment#70holee92026-04-28 05:09
    [Pre-C] Defect bilinear 보간 검증 + Hampel 검출 + Reflect padding
  • Issue comment#3holee92026-04-28 05:08
    [BI-03.01.01] Define dataset manifest schema and hash policy
  • Issue comment#10holee92026-04-28 05:08
    [Docs] Body-part VOI preset 확장 조사 결과 반영
  • Issue#67holee92026-04-28 05:06
    [작업] GUI layout/font/alignment 전수 점검 및 1차 개선
  • Issue#49holee92026-04-28 05:05
    [작업] pre: preprocess 런타임 검증 품질 개선
  • Issue comment#70holee92026-04-28 04:58
    [Pre-C] Defect bilinear 보간 검증 + Hampel 검출 + Reflect padding
  • Issue comment#69holee92026-04-28 04:45
    [Pre-B] Calibration multi-method 구현 + Cache 스레드 안전성
  • Issue comment#68holee92026-04-28 04:44
    [Pre-A] Offset 이중 구현 제거 + SIMD dispatch 활성화
  • Issue#70holee92026-04-28 04:03
    [Pre-C] Defect bilinear 보간 검증 + Hampel 검출 + Reflect padding

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.