Skip to content

i-Dear/sync-d-frontend

View on GitHub ↗Related repositories →

Sync-D: 실시간 아이디어 기획 협업 플랫폼

active 2024-03-04 → 2025-09-29 (UTC)

Complete coverage28,038 / 28,038 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-26 (UTC)
Events
1.2K
Pushes
373
Pull requests
155
Issues
167
Stars
4
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 575 days from 2024-03-04 to 2025-09-29. Pushes: 373 total, peak 33 in a day. Pull requests: 155 total, peak 9 in a day. Issues: 167 total, peak 9 in a day. Comments: 179 total, peak 14 in a day. Stars: 4 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
junly215342535956
jjunohj4271139553
vercel[bot]700070
jalju08049710

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 4 stars here means stars gained during the window, not the repo's star count.