Skip to content

iBase4J/iBase4J-SpringBoot

View on GitHub ↗Related repositories →

Spring,SpringBoot,SpringMVC,Mybatis,mybatis-plus,motan/dubbo分布式,Redis缓存,Shiro权限管理,Spring-Session单点登录,Quartz分布式集群调度,Restful服务,QQ/微信登录,App token登录,微信/支付宝支付;日期转换、数据类型转换、序列化、汉字转拼音、身份证号码验证、数字转人民币、发送短信、发送邮件、加密解密、图片处理、excel导入导出、FTP/SFTP/fastDFS上传下载、二维码、XML读写、�

active 2023-09-23 → 2026-09-15 (UTC)

Complete coverage27,804 / 27,804 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-16 (UTC)
Events
99
Pushes
0
Pull requests
0
Issues
0
Stars
98
Forks
1

Activity over time

Daily event counts in the loaded window

Line chart, 1089 days from 2023-09-23 to 2026-09-15. Pushes: 0 total, peak 0 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 98 total, peak 11 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

Nobody pushed, opened or commented here in the loaded window — this repo's activity is stars and forks only.

Recent activity

Latest issues, pull requests and releases

No issue or PR events — this repo's activity is pushes only.

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 98 stars here means stars gained during the window, not the repo's star count.