Skip to content

An effective DevOps analysis and auto-suggest tool。Coco 是一个研发效能分析工具,如团队发展现状(根据架构复杂度及行数变更)、团队演进、历史分析等。生成可视化报告及对应的改进建议。

active 2023-08-25 → 2025-04-12 (UTC)

Complete coverage27,355 / 27,355 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-09-27 (UTC)
Events
18
Pushes
0
Pull requests
0
Issues
1
Stars
13
Forks
3

Activity over time

Daily event counts in the loaded window

Line chart, 597 days from 2023-08-25 to 2025-04-12. Pushes: 0 total, peak 0 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 1 total, peak 1 in a day. Comments: 1 total, peak 1 in a day. Stars: 13 total, peak 1 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
lwz231000
phodal1001

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 13 stars here means stars gained during the window, not the repo's star count.