《建筑工程投标项目管理系统》是建筑施工企业用于招投标部门管理业务的系统,从工程投标登记到投标结束及工程竣工过程中所涉及到的事项都能灵活记录、修改、查询,不仅如此,系统还包括了基本信息、证件管理、介绍信管理、合同管理、投标分析、业务统计、打印报表等模块,使您将对本公司的业务经营情况了如指掌。系统提供完全独立的数据库系统,操作简单,容�
active 2024-12-23 → 2026-01-28 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 402 days from 2024-12-23 to 2026-01-28. Pushes: 0 total, peak 0 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 3 total, peak 1 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
Nobody pushed, opened or commented here in the loaded window — this repo's activity is stars and forks only.
Recent activity
Latest issues, pull requests and releases
No issue or PR events — this repo's activity is pushes only.
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 3 stars here means stars gained during the window, not the repo's star count.