一种支持依赖关系、任务兜底策略的任务调度管理工具。API灵活易用,稳定可靠。轻松提交主线程任务、异步任务。支持周期性任务,顺序执行任务,并行任务等。
active 2023-08-22 → 2025-12-23 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 855 days from 2023-08-22 to 2025-12-23. Pushes: 0 total, peak 0 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 1 total, peak 1 in a day. Comments: 0 total, peak 0 in a day. Stars: 34 total, peak 2 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| woxin123 | 1 | 0 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
- Issue#8woxin1232024-09-09 06:16IdleTask 不支持 delay
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 34 stars here means stars gained during the window, not the repo's star count.