Skip to content

islas/hpc-workflows

View on GitHub ↗Related repositories →

Template Workflows for running HPC CI/CD Regression Suites

active 2023-08-17 → 2025-01-23 (UTC)

Archive files: complete28,844 / 28,844 hourly files accounted for (100%) · 2 absent upstream2023-08-15 → 2026-11-28 (UTC)Some event types are under-captured. Data limits →
Events
257
Pushes
152
Pull requests
71
Issues
0
Recorded stars
2
Recorded forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 526 days from 2023-08-17 to 2025-01-23. Pushes: 152 total, peak 17 in a day. Pull requests: 71 total, peak 6 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Recorded stars: 2 total, peak 2 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Recorded stars

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

Machine share

4.5% bots

Bots wrote 4.5% of everything here.

Machine share, whole loaded window: of 223 contributions, People 96% (213), Bots 4.5% (10).

Whole loaded window (since Aug 2023). Share of pushes, PRs, issues, reviews and comments. Bots: logins ending in bot, robot or [bot], plus named automation. Bot work is mostly PRs, reviews and comments, whose capture fades from March 2026, so recent bot activity is undercounted.

ContributorContributionsPushesPRsComments
islas213142710
github-actions[bot]bot101000

Recent activity

Latest issues, pull requests and releases

Work week

Pushes, PRs, issues and comments per weekday, 2023-08-17 to 2025-01-23 (UTC). Stars are left out.

6.4×
weekday vs weekend

Office-hours project: a weekday carries 6.4× a weekend day

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 2 stars here means stars gained during the window, not the repo's star count.