CAT 作为服务端项目基础组件,提供了 Java, C/C++, Node.js, Python, Go 等多语言客户端,已经在美团点评的基础架构中间件框架(MVC框架,RPC框架,数据库框架,缓存框架等,消息队列,配置系统等)深度集成,为美团点评各业务线提供系统丰富的性能指标、健康状况、实时告警等。
active 2024-11-05 → 2025-08-28 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 297 days from 2024-11-05 to 2025-08-28. Pushes: 42 total, peak 7 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| jack-wqing | 42 | 42 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
No issue or PR events — this repo's activity is pushes only.
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.