Skip to content

A library of geometry processing tools for computer graphics

active 2023-09-01 → 2026-10-19 (UTC)

Complete coverage27,985 / 27,985 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-24 (UTC)
Events
396
Pushes
190
Pull requests
40
Issues
25
Stars
32
Forks
11

Activity over time

Daily event counts in the loaded window

Line chart, 1145 days from 2023-09-01 to 2026-10-19. Pushes: 190 total, peak 5 in a day. Pull requests: 40 total, peak 6 in a day. Issues: 25 total, peak 2 in a day. Comments: 63 total, peak 6 in a day. Stars: 32 total, peak 2 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
janba2251891119
cakarsubasi6901832
kdmarrett9004
cuirq37034
timfelle6051
zhtjtcz3001
Philip0352001
johnnynunez2020
so-rose1000
karranpandey1100
dependabot[bot]1010

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 32 stars here means stars gained during the window, not the repo's star count.