Skip to content

Nous avons utilisé GitHub pour la gestion du code, SonarQube pour analyser la qualité, Nexus pour le dépôt des livrables, et Docker pour les conteneurs Spring. Jenkins a géré CI/CD avec Jacoco pour la couverture des tests. Prometheus et Grafana ont assuré la surveillance, et des e-mails ont suivi les étapes de la pipeline."

active 2024-10-092024-12-12 (UTC)

Complete coverage26,673 / 26,673 hourly files (100%) · 2 absent upstream2023-08-152026-08-30 (UTC)
Events
217
Pushes
198
Pull requests
2
Issues
0
Stars
0
Forks
1

Activity over time

Daily event counts in the loaded window

Line chart, 65 days from 2024-10-09 to 2024-12-12. Pushes: 198 total, peak 29 in a day. Pull requests: 2 total, peak 2 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
Eyamrad1757320
aminelahmer1474700
Hadilriabi343400
AbdessalemL161600
jasserayadi151500
AzizGramy1131300

Recent activity

Latest issues, pull requests and releases

  • Pull request#1Eyamrad12024-10-10 16:27
  • Pull request#1Eyamrad12024-10-10 16:27

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.