🔥 🔥 官方推荐 🔥 🔥 高并发大麦网售票系统,使用 SpringCloud、Kafka、Redis、Sentinel、ElasticSearch、ShardingSphere 等,通过优化锁的策略、多级缓存管理、数据提前预热、精确的定制限流等多种策略,显著的降低下单延迟。此外还解决各种高并发难题的实际落地解决方案。是面试、就业、提高技术的不二选择!
active 2025-06-21 → 2026-06-09 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 354 days from 2025-06-21 to 2026-06-09. Pushes: 19 total, peak 3 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 287 total, peak 12 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| shining-stars-l | 19 | 19 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
No issue or PR events — this repo's activity is pushes only.
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 287 stars here means stars gained during the window, not the repo's star count.