Skip to content

Software-Defined Networking tools for LXC (LinuX Containers)

active 2023-08-17 → 2026-04-20 (UTC)

Complete coverage27,994 / 27,994 hourly files (100%) · 2 absent upstream2023-08-15 → 2026-10-24 (UTC)
Events
272
Pushes
4
Pull requests
13
Issues
23
Stars
175
Forks
29

Activity over time

Daily event counts in the loaded window

Line chart, 978 days from 2023-08-17 to 2026-04-20. Pushes: 4 total, peak 1 in a day. Pull requests: 13 total, peak 5 in a day. Issues: 23 total, peak 17 in a day. Comments: 26 total, peak 11 in a day. Stars: 175 total, peak 4 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
jpetazzo494918
yoursunny7014
ClausKlein3011
canghaiwuhen3001
alexamirante2020
IvanRibakov2000
osmith421001
Amine-Zroud1001

Recent activity

Latest issues, pull requests and releases

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 175 stars here means stars gained during the window, not the repo's star count.