Skip to content

kamilbaczek/Modular-monolith-by-example

View on GitHub ↗Related repositories →

Modular monolith architecture example in .NET. Estimation Tool is tool to optimize estimation process in IT company.

active 2023-10-05 → 2026-05-03 (UTC)

Archive files: complete28,601 / 28,601 hourly files accounted for (100%) · 2 absent upstream2023-08-15 → 2026-11-18 (UTC)Some event types are under-captured. Data limits →
Events
78
Pushes
0
Pull requests
4
Issues
0
Recorded stars
64
Recorded forks
8

Activity over time

Daily event counts in the loaded window

Line chart, 942 days from 2023-10-05 to 2026-05-03. Pushes: 0 total, peak 0 in a day. Pull requests: 4 total, peak 2 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Recorded stars: 64 total, peak 3 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Recorded stars

Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
dependabot[bot]2020
countneuroman2020

Recent activity

Latest issues, pull requests and releases

  • Pull request#36dependabot[bot]2024-01-16 19:47
  • Pull request#35countneuroman2024-01-01 09:52
  • Pull request#35countneuroman2024-01-01 09:49
  • Pull request#34dependabot[bot]2023-10-18 21:16

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 64 stars here means stars gained during the window, not the repo's star count.