active 2026-06-06 → 2026-07-10 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 35 days from 2026-06-06 to 2026-07-10. Pushes: 11 total, peak 4 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Recorded stars: 0 total, peak 0 in a day. Shaded from 2026-03-01: From Mar 2026 GH Archive records only part of non-push events (stars, PRs, issues, comments). The shading marks archive capture loss, not a fall in GitHub activity.
- Pushes
- Pull requests
- Issues
- Comments
- Recorded stars
Shaded: archive capture loss, not a fall in GitHub activity · Data health
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes held up until mid-August 2026 and then collapsed too, so read the shaded part of the chart as the archive, not this repository. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| AshutoshVJTI | 11 | 11 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
No issue or PR events — this repo's activity is pushes only.
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.