:hotel: :office: :department_store: :school: A simulation environment, which mimics the scheduling of multiple elevators within a building of any size. The multithreaded approach helps to simulate elevators running concurrently. The simulation also makes use of several group scheduling algorithms, which help to distribute the workload between eleva
active 2023-09-11 → 2025-01-10 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 488 days from 2023-09-11 to 2025-01-10. Pushes: 0 total, peak 0 in a day. Pull requests: 1 total, peak 1 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 19 total, peak 1 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| kennyfh | 1 | 0 | 1 | 0 |
Recent activity
Latest issues, pull requests and releases
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 19 stars here means stars gained during the window, not the repo's star count.