Skip to content

levos-snr/recycle4Change-R4C

View on GitHub ↗Related repositories →

Assume you are working as a database designer at Recycle4Change (R4C). Your current responsibility is to develop both the conceptual and logical models that will fulfil the data requirements of the software system. Specific details for these tasks are outlined in the assignment brief.

active 2024-06-182024-06-19 (UTC)

Complete coverage27,266 / 27,269 hourly files (100%) · 2 absent upstream2023-08-152026-09-24 (UTC)
Events
18
Pushes
17
Pull requests
0
Issues
0
Stars
0
Forks
0

Activity over time

Daily event counts in the loaded window

Line chart, 2 days from 2024-06-18 to 2024-06-19. Pushes: 17 total, peak 9 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.

  • Pushes
  • Pull requests
  • Issues
  • Comments
  • Stars

Top contributors

Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity

ContributorContributionsPushesPRsComments
levos-snr171700

Recent activity

Latest issues, pull requests and releases

No issue or PR events — this repo's activity is pushes only.

Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.