## 更新的功能点 1,增加了轮廓线粗细、填充mask透明度可在界面调节的功能; 2,增加了给每个实例打多个标签的功能(Ctrl键); 3,增加了给整张图打一个标签的功能; 4,增加了在用户标注界面可以配置标签列表和切换已经内置的多个标签列表的功能; 5,增加多边形标注时,可以跟踪鼠标移动的轨迹的功能;
active 2025-06-27 → 2025-10-30 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 126 days from 2025-06-27 to 2025-10-30. Pushes: 13 total, peak 2 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
| Contributor | Contributions | Pushes | PRs | Comments |
|---|---|---|---|---|
| luoolu | 12 | 12 | 0 | 0 |
Recent activity
Latest issues, pull requests and releases
No issue or PR events — this repo's activity is pushes only.
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.