本项目提供37种不同的图像卷积算子,用来评估图像的锐度、清晰度,并给出了比较不同算子和算法的方法,该方法可高效、准确的找到合适的图像清晰度评估算法,来适用于不同应用、不同类型和内容的图片,并根据最佳清晰度确定相机镜头的调焦角度。
active 2025-11-19 → 2025-11-19 (UTC)
Activity over time
Daily event counts in the loaded window
Line chart, 1 days from 2025-11-19 to 2025-11-19. Pushes: 0 total, peak 0 in a day. Pull requests: 0 total, peak 0 in a day. Issues: 0 total, peak 0 in a day. Comments: 0 total, peak 0 in a day. Stars: 0 total, peak 0 in a day.
- Pushes
- Pull requests
- Issues
- Comments
- Stars
Stars, PRs, issues and forks are under-captured in the later part of this window. GH Archive progressively stopped capturing non-push events during 2026 — −95% or worse by the end of the window. Every series here except Pushes fades for that reason, so a decline above reflects the archive, not this repository. Pushes stay reliable throughout, so read them, and the contributor counts derived from them, as the real signal. Data health has the measurements.
Top contributors
Pushes, PRs, issues, reviews and comments — stars and forks excluded, so this is contribution rather than popularity
Nobody pushed, opened or commented here in the loaded window — this repo's activity is stars and forks only.
Recent activity
Latest issues, pull requests and releases
No issue or PR events — this repo's activity is pushes only.
Totals cover only the window loaded into ClickHouse and count events, not GitHub's lifetime totals — 0 stars here means stars gained during the window, not the repo's star count.